BACKGROUND
The 126 km long water pipeline runs through a combination of mountainous terrain, swamps and dry desert conditions.
KIM™ was used to waterproof and prevent corrosion of reinforcing steel. KIM™ was also applied to protect it against sulphate attack and guard the steel against water-soluble contaminants.
SOLUTION
The pipes consist of a steel frame lined inside and out with concrete. The concrete lining on the outside of the pipes was coated using the Krystol™ T1 and KIM™ (Krystol™ Internal Membrane). Pump stations along the pipeline were coated with the Krystol™ T1/T2 Waterproofing System.
The pipeline is still in operation and provides effective, low maintenance supply of fresh water from Ville de Bravo to Mexico City.
| Product | Krystol™ T1 , KIM™ (Krystol™ Internal Membrane) |
| Location | Ville de Bravo to Mexico City, Mexico |
| Owner | Mexico D.F. |
| Applicator | PLASTICOS Liquidos Sylpyl S.A. |
| Engineer | Federal Water Board |

1 800 267 8280